Industrial photovoltaic system – Adro (BS) | 4.506,36 kWp
High-complexity multi-section (6) photovoltaic plant, designed and built in an advanced industrial complex. The intervention included the executive design, the construction of the different plant sections, and integration with existing infrastructures, ensuring high standards of reliability and operational continuity.
The solution was developed to cover a significant portion of the energy needs of the production site, contributing to the reduction of energy costs and the improvement of the company’s environmental performance. An estimated annual production of about 5,300,000 kWh is expected, with a reduction of emissions of approximately 2,120 tons of CO₂ per year.
Power 4,506.36 kWp