Industrial photovoltaic system – Castel San Pietro Terme (BO) | 600 kWp
Industrial photovoltaic system installed by Refeel EPC Italia at the production site of Glastebo International Srl. The project included the complete refurbishment of the roof with asbestos removal and new insulation to improve existing thermal losses. A large-scale system of 600 kWp was installed, divided into 2 sections, aimed at self-consumption and reducing the company’s carbon footprint. The estimated annual production is approximately 720,000 kWh, resulting in an environmental saving of about 290 tons of CO₂ avoided each year.
Power 600 kWp










